January 4, 2026
The dismantling sequence of bridge formwork after steel formwork construction:
1. Before dismantling and adjusting the formwork, check that all bolts have been removed. Adjustment is only permitted after confirming that nothing is missing and the formwork has separated from the concrete.
2. After dismantling, the formwork should be temporarily secured, placed face-to-face with a wide walkway in between for cleaning and applying release agent.
3. After dismantling, thoroughly clean the surface of the formwork, apply release agent promptly, and place it on wooden blocks when not in use, neatly stacking it in a dry and ventilated place.
Bridge steel formwork is a steel formwork used for concrete pouring and shaping. Besides steel formwork, there are also wooden formwork, plywood formwork, etc. Bridge steel formwork strives for economy while maintaining quality and construction period, reducing labor for erection and dismantling, and achieving civilized construction. Steel formwork is widely used in construction projects due to its reusability and aesthetically pleasing concrete pouring results.
![]()