December 31, 2025
The preparation work before bridge painting mainly includes the following aspects:
1. Surface treatment: The bridge surface needs to be treated to remove dirt, grease, rust, etc., ensuring the surface is clean, dry, and smooth.
2. Surface inspection: Inspect the bridge surface for defects such as cracks, dents, and protrusions. If any are found, they need to be repaired.
3. Environmental protection: Before painting, the surrounding environment needs to be protected, such as covering surrounding vegetation and buildings, to prevent paint pollution.
4. Selection of appropriate painting equipment: Select appropriate painting equipment, such as spray guns and spray painting machines, based on the size, shape, and surface condition of the bridge.
5. Selection of appropriate paint materials: Select appropriate paint materials, such as anti-corrosion paint and wear-resistant paint, based on the bridge's purpose and environmental conditions.
6. Developing a construction plan: Develop a detailed construction plan, including the painting time, sequence, and thickness, to ensure construction quality.
7. Safety measures: Before painting, safety measures need to be taken, such as wearing protective masks and gloves, to prevent harm to the health of workers.