January 22, 2026
The total construction area of the project is about 129000 square meters, and the seismic fortification intensity of the location is 7 degrees. The designed basic seismic acceleration value is 0.15g.
A total of 584 sets of our company's lead core isolation rubber bearings and natural isolation rubber bearings were used.
![]()